September 2018

NoCourseStartingLocation DurationFee
1Basic Welder, Welder BNSP dan Welder Kemnaker Kelas 1,2,310 & 24 September 2018PT. SLV Metropolitan Indonesia Basic Welder : 11 Days
Welder BNSP : 3 Days
Welder Kemnaker : 5 Days
Basic Welder Rp. 18.500.000,-
Welder BNSP : Rp. 6.500.000,-
Welder Kemnaker : Rp. 14.500.000,-
2Welding Inspector (WI)8 September 2018PT. SLV Metropolitan Indonesia 1 Bulan- WI SLV (Rp. 10.000.000,-)
- WI BNSP (Rp. 16.500.000,-)
- WI SLV + CSWIP 3.0 + BNSP) Rp. 22.800.000.-
- WI SLV + BNSP + NDT RI (Rp. 21.000.000,-)
3CSWIP 3.0 Visual Welding Inspector17 September 2018PT. SLV Metropolitan Indonesia 3 DaysUSD $ 835
4BGAS CSWIP Painting Inspector - Grade 2 17 September 2018PT. SLV Metropolitan Indonesia 5 DaysUSD $ 1.950
5NDT RI24 September 2018PT. SLV Metropolitan Indonesia 7 DaysRp. 8.200,000
6NDT UT17 September 2018PT. SLV Metropolitan Indonesia 12 DaysRp. 11.500.000
7Risk Based Inspection (RBI)24 September 2018PT. SLV Metropolitan Indonesia 5 DaysRp. 15.000.000,-
8K3 Migas 8 September 2018PT SLV Metropolitan Indonesia 4 DaysRP. 7.500.000,-
9AK3 Umum8 September 2018PT SLV Metropolitan Indonesia12 DaysRp. 7.500.000,-